Skip to content

Building engineering · Bamako, Mali

Engineering the Future of Africa

The seven technical disciplines of a modern building, designed and integrated by one team. From the first study to long-term maintenance.

  • Electrical
  • Networks
  • Security
  • Access control
  • Fire
  • Solar
  • Automation
HYRIS Smart Élite integration workshop
Engineering practice

We do not install equipment.
We design the infrastructure.

HYRIS Smart Élite integrates the technical infrastructure of the modern building: energy, electrical distribution, networks, security, access, fire protection and automation. Based in Bamako, we work alongside demanding architects, developers and building operators.

  • One point of contact across all seven disciplines
  • Study before cable: load calculations, drawings, functional analysis
  • Open protocols — KNX, DALI-2, Zigbee, Modbus — never proprietary
  • A complete as-built file handed over on every project
  • Maintenance designed in from the start, not bolted on afterwards
  • Installations that can be repaired and extended, built to last
About the practice
  • 7technical disciplines

    Covered by one team, from power distribution to supervision.

  • 1point of contact

    The same person from the first survey to the maintenance contract.

  • 6documented stages

    From understanding the brief to the building's later evolution.

  • 3specification levels

    Essential, Comfort and Élite: the same care, three budgets.

Standards appliedIEC 60364ISO/IEC 11801EN 54ISO/IEC 14543and the standards specific to each discipline

Use cases

What we deliver, building by building

Every building type imposes its own constraints. Here is what a HYRIS project covers in practice, from a private home to a site that never closes.

Private villa

A house that anticipates without drawing attention

Presence, lighting and climate scenes tuned to how the household actually lives. No superfluous screen, no extra gesture: the engineering is forgotten. Follow-up continues after commissioning.

Corporate headquarters

Documented infrastructure, delivered on time

Load calculations, construction drawings and a complete as-built file at handover. Copper and fibre are sized on real load, with the headroom future extensions will need.

Hospitality

Building management for a site that never closes

Central room control: comfort from the moment the guest arrives, consumption cut when the room is empty. Works are organised floor by floor so operation is never interrupted.

Design team

Architectural intent translated into infrastructure

Openings, routes and accessory positions settled during the design phase, with the architect. The installation follows the drawing instead of constraining it afterwards.

Retail & showroom

Lighting that puts the merchandise on stage

DALI-2 scenes by zone and by time of day, driven from a tablet. Presentation follows the rhythm of the collections with no further work on the installation.

Ecosystem

Open technologies, chosen to last

We integrate documented, interoperable standards rather than closed systems: an installation must remain serviceable, extendable and repairable ten years on.

KNXCertifié

KNX Association

Automation bus

DALICertifié

DALI Alliance

Lighting

ZigbeeCertifié

Zigbee Alliance / CSA

Wireless

Home AssistantCertifié

Home Assistant

Open supervision

SchneiderCertifié

Schneider Electric

Devices & BMS

HagerCertifié

Hager

Electrical distribution

LegrandCertifié

Legrand

Infrastructure

ABBCertifié

ABB

Energy & automation

UbiquitiCertifié

Ubiquiti

Networks

HikvisionCertifié

Hikvision

Electronic security

HuaweiCertifié

Huawei FusionSolar

Photovoltaics

SomfyCertifié

Somfy

Motorisation & blinds

Method

Six stages, none improvised

The same sequence for a 300 m² villa and for an 88-room hotel. Only the scale changes.

  1. 01

    Listening & survey

    We understand the uses, the architectural brief and the site constraints before proposing anything technical.

  2. 02

    Design & engineering

    Load calculations, drawings, functional analysis and a detailed cost breakdown: the project is fully documented.

  3. 03

    Coordination & site works

    We lead our own teams and coordinate with the other trades, so execution is clean and nothing has to be redone.

  4. 04

    Commissioning & tuning

    Testing, measurement, scene configuration and fine adjustment before handover.

  5. 05

    Training & handover

    Occupants are shown how it works, and receive the complete as-built file and clear usage guides.

  6. 06

    Maintenance & evolution

    Maintenance contracts, remote supervision, and adaptation of the system as the building's life changes.

Tell us about your project

Describe the building. We will describe the infrastructure.

A study, a detailed cost breakdown discipline by discipline, and one point of contact from the first survey through to maintenance. We reply within two working days.

Message us on WhatsApp